You are here

Blog: April 2017

Scaling Scrum (3-4 teams) (Part 2)

This builds on Scaling Scrum (3-4 teams) (Part 1) Part 1 looked at the situation where there were multiple teams working on a single product. This will look at instances where there are multiple teams working on different projects/products in the same organisation. i.e. each team has a different backlog. Remember the rule though 1 product = 1 backlog!
What we are going to do here is to make sure that separate products/projects are in sync with each other and dependencies are made visible and met with minimal delay.

Some examples may be:

Subscribe to Blog: April 2017