You are here

product owner

Error message

  • Deprecated function: TYPO3\PharStreamWrapper\Manager::initialize(): Implicitly marking parameter $resolver as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).
  • Deprecated function: TYPO3\PharStreamWrapper\Manager::initialize(): Implicitly marking parameter $collection as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).
  • Deprecated function: TYPO3\PharStreamWrapper\Manager::__construct(): Implicitly marking parameter $resolver as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).
  • Deprecated function: TYPO3\PharStreamWrapper\Manager::__construct(): Implicitly marking parameter $collection as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).

Scaling Scrum (3-4 teams) (Part 2)

This builds on Scaling Scrum (3-4 teams) (Part 1) Part 1 looked at the situation where there were multiple teams working on a single product. This will look at instances where there are multiple teams working on different projects/products in the same organisation. i.e. each team has a different backlog. Remember the rule though 1 product = 1 backlog!
What we are going to do here is to make sure that separate products/projects are in sync with each other and dependencies are made visible and met with minimal delay.

Some examples may be: