You are here

Blog: 13 May 2016

Error message

  • Deprecated function: TYPO3\PharStreamWrapper\Manager::initialize(): Implicitly marking parameter $resolver as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).
  • Deprecated function: TYPO3\PharStreamWrapper\Manager::initialize(): Implicitly marking parameter $collection as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).
  • Deprecated function: TYPO3\PharStreamWrapper\Manager::__construct(): Implicitly marking parameter $resolver as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).
  • Deprecated function: TYPO3\PharStreamWrapper\Manager::__construct(): Implicitly marking parameter $collection as nullable is deprecated, the explicit nullable type must be used instead in include_once() (line 19 of /homepages/11/d343571938/htdocs/drupal/includes/file.phar.inc).

Scaling Scrum (3-4 teams) (Part 1)

Scaling Scrum is easy, have a look at the Scrum guide at http://www.scrumguides.org . You have a number of teams that each operate as normal and a member from each of the team attends an additional daily scrum. Yes, it all makes sense, but it is a lot easier to say than do, even on a small scale. There are a few practical things that newer teams and organisations need to think about and do other things will descend into a state of anarchy.

By and large there are two sets of circumstances where you need to scale.

Subscribe to Blog: 13 May 2016